Friday the blocks arrived at 6:30am and by the time I got there around 9:00am there were 20 guys working sooo hard at blocking this house up. I was on cloud nine. The trucks kept coming and the guys kept working. I had to make some decisions though (again) that I didn't know I'd have to make...for one, the fireplace in our bedroom. Because it sits on an exterior wall I needed to tell them the specific dimensions so that they could set the header height correctly. Luckily I had gotten some brochures on fireplaces, but hadn't made my ultimate decision on which brand I was going with...but how different could they be, right?! So I told them a number, and we went with it! Then next problem arrives...plumber put the vent pipe thru the centerline of the window...duh...so luckily my concrete guy was able to correct it so they could continue blocking. Finally they got to the back reading area in my bedroom and the window sizes that my window guy gave me were too big...so I quickly got on the horn with them, got different measurements and could check this problem off the list!
We've had a couple things we have had to iron out but hopefully by next Tuesday we'll finish up the blocking and move forward...onto the next set of "challenges!" :)


It's so funny how when the slab by itself was down the house looked way smaller than I thought it would look like...but once they put the 10'8" walls up, it started looking huge...I can only imagine once the 2nd story goes up. I've been told that the house will look small, big, small, big throughout the entire building process.